Hardwood, Softwood & Composite Decking in Belvedere
Bespoke composite and timber decking installations built on engineered C24 subframes across Belvedere DA17. Experienced with Millboard & Trex composite boards, Yellow Balau hardwood, and treated softwood. Founder-led by Billy Maddox & Vincent O'Connell.
- 9.8 / 10 Checkatrade, 23 verified reviews
-
- Founder-led by Billy Maddox & Vincent O'Connell
- Every job built by the two founders
Last updated
Decking in Belvedere: Terraces, Hillside Semis and Low-Lying Ground
We build hardwood, softwood and composite decks in Belvedere DA17, using deep footings for soft river-edge ground and checking flood risk at a free survey before you get a quote.
Belvedere runs from the terraced streets of Lower Belvedere and Nuxley Village up to interwar semis on the hill towards Upper Belvedere, so both the slope and the ground change within a short distance. Victorian and Edwardian houses sit below, and 1930s-era family homes above.
Close to the Thames estuary the ground is low-lying and marshland-influenced, and exposed sites feel the wind, so we isolate the boards from damp soil and specify fixings for wind loading. Higher up, towards Nuxley Village, the ground is Thanet Sand, which drains better.
We are based in Woolwich, South East London, and our founders carry out free on-site surveys across Belvedere.
Which Decking Suits Belvedere Gardens?
Low-lying plots near the river favour composite on deep footings, because timber posts and softwood boards tend to rot faster in soft, wet ground. The higher streets drain better, so hardwood or softwood decks also work well there if they are kept treated.
Hillside gardens often need a level platform cut or built into the slope, which is where the 30cm planning limit comes in. Our composite vs timber decking comparison covers how the materials compare, and the decking installation overview covers how we build.
Composite, Hardwood, Modified Timber or Softwood?
We install all four. Here is how they compare on the things people ask about most.
Composite
Millboard and Trex
Slip: textured or grained surfaces, but algae still needs washing off.
Upkeep: soap and water, no oiling.
Heat: holds heat longer in sun, darkest tones most.
Feel: engineered and splinter-free; Millboard has a deep natural grain.
Hardwood
Balau, Ipe, Cumaru and more
Slip: moderate; oily species can be slick when wet, so grooved boards help.
Upkeep: oil yearly to keep the colour, or leave to silver.
Heat: stays cooler underfoot than dark composite.
Feel: real, dense timber grain.
Modified timber
Kebony, Accoya and ThermoWood
Slip: behaves like natural timber; reeded profiles are available.
Upkeep: low; an occasional clean, with oil optional to hold the colour.
Heat: like natural timber, cooler than dark composite.
Feel: real wood, treated to be more stable.
Softwood
Pressure-treated
Slip: poor when wet or mouldy, especially in shade.
Upkeep: the most; oil or stain every year or two.
Heat: stays cool in sun.
Feel: classic timber look, but weathers and can splinter.
See the full comparison on our decking hub, or read composite vs timber decking.
What Our Belvedere Site Survey Looks At
Every Belvedere garden is different, so the free survey checks the things that decide how the deck should be built:
- Ground: soft alluvium low down, or Thanet Sand on the hill, which sets footing depth.
- Flood and surface water: Belvedere has tidal flood risk along the river and widespread surface water risk, checked against the Environment Agency map.
- Wind: how exposed the plot is, which affects fixings and bracing.
- Slope: the fall across the garden and the height at its highest point.
- Conservation area: whether Crossness or another designation affects your address.
What's Under the Boards: How We Build the Frame in Belvedere
Most deck failures start below the surface, not in the boards. Whatever board you choose, every deck we build uses the same structure:
- C24 strength-graded timber frame that carries the load properly.
- Breathable membrane over prepared ground, so weeds stay down and ground moisture can escape.
- Joists at 400mm centres (300mm for diagonal board layouts), so boards stay flat and firm.
- Airflow underneath, because a frame that cannot dry out is a frame that rots.
- Structural pedestals and deeper footings where the ground is soft or wet.
- No new boards over an old frame. If the existing frame is not sound, it is replaced.
Low ground near the river is soft alluvium, so we use deep footings and pedestals there. Higher up towards Nuxley Village the ground drains better. This is general area guidance, not a promise about any single garden, so we check yours at the survey.
Want to know what goes wrong when a deck is built cheaply? Read why decks fail and how to build one that lasts.
What's Included in Your Decking Quote in Belvedere
After your free survey you receive an itemised written quote, so you can see exactly what is being built and what you are paying for. A decking quote covers:
- The free on-site survey and measuring up.
- Ground preparation and levelling.
- Breathable membrane.
- The C24 frame, with footings and pedestals where the ground needs them.
- Your chosen boards and fixings.
- Trims, edging and steps, as designed for your garden.
- Waste removal and a clean site at the end.
Anything extra you ask for is itemised separately, so nothing is hidden in the small print.
Planning, Flooding and Drainage: What to Check Before Building a Deck in Belvedere
Belvedere is in the London Borough of Bexley. Under the Planning Portal rules, garden decking is normally permitted development if it is no more than 30cm above the ground, covers no more than 50% of the garden together with any extensions and outbuildings, and is not forward of the front wall of the house. A raised deck above 30cm, or any decking within the grounds of a listed building, needs planning permission. On designated land such as conservation areas, decking at the side of the house is not permitted development either. Bexley has 23 conservation areas, and Article 4 directions apply in four of them: Brook Street (Northumberland Heath), Old Bexley, Old Forge Way (Sidcup) and Red House Lane (Bexleyheath). Crossness in Belvedere is one of the borough's conservation areas, so check whether your address is in one. Bexley Council's conservation and heritage page lists all 23 conservation areas with their appraisals.
Bexley's flood risk assessment identifies tidal flood risk along the Thames frontage, defended by raised tidal defences, and notes that large parts of Abbey Wood and Belvedere flooded in 1953. Abbey Wood and Belvedere are also at widespread risk of surface water flooding. Check the Environment Agency flood map for your address; a raised, ventilated subframe suits ground that can get wet.
In a conservation area you must give the council six weeks' written notice before cutting or pruning a tree, and the council can respond with a Tree Preservation Order, so a deck layout has to work around mature trees rather than assume they can come out. This is general guidance, not planning advice; always confirm with your local council before building. Our full guide to planning permission for decking in London covers every rule in detail. Once your deck is built, our decking maintenance and winter care guide and our guide to choosing a decking oil, stain or paint cover looking after it.
Balau Hardwood Decking
A recent Balau hardwood decking installation by The Tree Amigos Landscaping, South East London — showcasing the rich natural grain and warm tones of premium hardwood timber.
Quality Craftsmanship & Proof of Work
Every decking project is built and supervised by the founders, Billy Maddox and Vincent O'Connell.
Explore Our Full Transformation Case Study
See our complete breakdown of a full garden transformation featuring high-performance paving, timber sleeper planters, and boundary fencing completed in 8 working days.
View Case Study Breakdown →Frequently Asked Questions: Belvedere Decking
How do you handle sloped gardens in Belvedere?
Do I need planning permission for decking in Belvedere?
Is Belvedere at risk of flooding?
Which decking is best near the Thames in Belvedere?
Can you build a deck on the hillside streets in Belvedere?
How do I get an itemised quote for my Belvedere decking project?
Get a Decking Quote in Belvedere
How the Free Survey Works
- You get in touch. Send the form, call, or message on WhatsApp. Photos of the garden help but are optional.
- A founder visits. Billy Maddox or Vincent O'Connell comes to the garden and measures the space.
- We check what decides the build: ground, levels, access, trees, and where the deck meets the house, including damp-proof course and air brick positions.
- You see samples and options. We talk through board samples, the frame and how you will use the space.
- You get an itemised written quote showing what is included.
Prefer to talk? Call 07470 419 056.
Decking Pages Across Our Service Area
Every area has its own page covering local ground, planning and access. See the London decking hub for the full range.
South East London
Bexley and Dartford
Bromley and the Kent Edge
South West London and Croydon
North East London
Schedule Your Belvedere Decking Survey
Speak directly with founders Billy and Vincent for expert advice and a free on-site survey across Belvedere DA17.