Hardwood, Softwood & Composite Decking in Bexley
Bespoke composite and timber decking installations built on engineered C24 subframes across Bexley Village DA5. Experienced with Millboard & Trex composite boards, Yellow Balau hardwood, and treated softwood. Founder-led by Billy Maddox & Vincent O'Connell.
- 9.8 / 10 Checkatrade, 23 verified reviews
-
- Founder-led by Billy Maddox & Vincent O'Connell
- Every job built by the two founders
Last updated
Decking in Bexley Village: Heritage Gardens by the Cray
We build hardwood, softwood and composite decks in Bexley Village DA5, raised and ventilated for the damp ground of the River Cray valley, with a free survey before you get a quote.
Bexley Village and Old Bexley have genuine heritage character, with historic cottages, Victorian detached homes and long-established garden layouts around Blendon and the high street. A deck here should fit around existing planting and boundary features rather than flatten them.
The high water table close to the River Shuttle and River Cray around Old Bexley and Blendon accelerates timber rot at untreated ground-level post bases, so we keep boards clear of standing ground moisture with a ventilated subframe on structural pedestals.
We are based in Woolwich, South East London, and our founders carry out free on-site surveys across Bexley.
Which Decking Suits Bexley Village Gardens?
Where the ground stays wet, composite is the low-maintenance choice because the boards do not rot, and it suits layouts designed around established planting. Hardwood suits owners who want natural timber and accept the oiling that goes with it.
Older gardens often have mature trees and established borders, so the layout is shaped around them rather than cleared first. Our composite vs timber decking comparison compares the materials.
Composite, Hardwood, Modified Timber or Softwood?
We install all four. Here is how they compare on the things people ask about most.
Composite
Millboard and Trex
Slip: textured or grained surfaces, but algae still needs washing off.
Upkeep: soap and water, no oiling.
Heat: holds heat longer in sun, darkest tones most.
Feel: engineered and splinter-free; Millboard has a deep natural grain.
Hardwood
Balau, Ipe, Cumaru and more
Slip: moderate; oily species can be slick when wet, so grooved boards help.
Upkeep: oil yearly to keep the colour, or leave to silver.
Heat: stays cooler underfoot than dark composite.
Feel: real, dense timber grain.
Modified timber
Kebony, Accoya and ThermoWood
Slip: behaves like natural timber; reeded profiles are available.
Upkeep: low; an occasional clean, with oil optional to hold the colour.
Heat: like natural timber, cooler than dark composite.
Feel: real wood, treated to be more stable.
Softwood
Pressure-treated
Slip: poor when wet or mouldy, especially in shade.
Upkeep: the most; oil or stain every year or two.
Heat: stays cool in sun.
Feel: classic timber look, but weathers and can splinter.
See the full comparison on our decking hub, or read composite vs timber decking.
What Our Bexley Village Site Survey Looks At
Every Bexley Village garden is different, so the free survey checks the things that decide how the deck should be built:
- Water table: how wet the ground is close to the Cray or Shuttle, which sets the subframe design.
- Flood risk: whether your address is in an area the Environment Agency issues Cray or Shuttle flood warnings for.
- Old Bexley Conservation Area: whether you are in it, as it has an Article 4 direction.
- Planting and trees: existing borders and mature trees the layout should work around.
- Boundaries: fences and walls that give these gardens their character.
What's Under the Boards: How We Build the Frame in Bexley
Most deck failures start below the surface, not in the boards. Whatever board you choose, every deck we build uses the same structure:
- C24 strength-graded timber frame that carries the load properly.
- Breathable membrane over prepared ground, so weeds stay down and ground moisture can escape.
- Joists at 400mm centres (300mm for diagonal board layouts), so boards stay flat and firm.
- Airflow underneath, because a frame that cannot dry out is a frame that rots.
- Structural pedestals and deeper footings where the ground is soft or wet.
- No new boards over an old frame. If the existing frame is not sound, it is replaced.
Bexley Village sits in the River Cray valley, with silty alluvium and a high water table, so the frame is kept raised and ventilated rather than sitting in damp ground. This is general area guidance, not a promise about any single garden, so we check yours at the survey.
Want to know what goes wrong when a deck is built cheaply? Read why decks fail and how to build one that lasts.
What's Included in Your Decking Quote in Bexley
After your free survey you receive an itemised written quote, so you can see exactly what is being built and what you are paying for. A decking quote covers:
- The free on-site survey and measuring up.
- Ground preparation and levelling.
- Breathable membrane.
- The C24 frame, with footings and pedestals where the ground needs them.
- Your chosen boards and fixings.
- Trims, edging and steps, as designed for your garden.
- Waste removal and a clean site at the end.
Anything extra you ask for is itemised separately, so nothing is hidden in the small print.
Planning, River Cray Flooding and Old Bexley: What to Check Before Building a Deck in Bexley Village
Bexley Village is in the London Borough of Bexley. Under the Planning Portal rules, garden decking is normally permitted development if it is no more than 30cm above the ground, covers no more than 50% of the garden together with any extensions and outbuildings, and is not forward of the front wall of the house. A raised deck above 30cm, or any decking within the grounds of a listed building, needs planning permission. On designated land such as conservation areas, decking at the side of the house is not permitted development either. Old Bexley is a conservation area with an Article 4 direction, one of four in the borough, so external works that would normally be permitted development, such as changes to windows or front boundary treatments, need a planning application. Check before building if you live in the village. Bexley Council's conservation and heritage page lists all 23 conservation areas with their appraisals.
The River Cray runs through Bexley, and Bexley's flood risk assessment records the most significant river flood event as 1977, which caused extensive flooding in Crayford and Old Bexley. The Environment Agency issues flood warnings for the River Cray and the River Shuttle in this area. Check the Environment Agency flood map for your address; a raised, ventilated subframe suits ground that can get wet.
In a conservation area you must give the council six weeks' written notice before cutting or pruning a tree, and the council can respond with a Tree Preservation Order, so a deck layout has to work around mature trees rather than assume they can come out. This is general guidance, not planning advice; always confirm with your local council before building. Our full guide to planning permission for decking in London covers every rule in detail. Once your deck is built, our decking maintenance and winter care guide and our guide to choosing a decking oil, stain or paint cover looking after it.
Balau Hardwood Decking
A recent Balau hardwood decking installation by The Tree Amigos Landscaping, South East London — showcasing the rich natural grain and warm tones of premium hardwood timber.
Quality Craftsmanship & Proof of Work
Every decking project is built and supervised by the founders, Billy Maddox and Vincent O'Connell.
Explore Our Full Transformation Case Study
See our complete breakdown of a full garden transformation featuring high-performance paving, timber sleeper planters, and boundary fencing completed in 8 working days.
View Case Study Breakdown →Frequently Asked Questions: Bexley Decking
How do you handle damp ground near the River Shuttle and River Cray in Bexley?
Do I need planning permission for decking in Old Bexley?
Is Bexley Village at risk of River Cray flooding?
Can a deck be built around existing planting in Old Bexley?
How do I get an itemised quote for my Bexley decking project?
Get a Decking Quote in Bexley
How the Free Survey Works
- You get in touch. Send the form, call, or message on WhatsApp. Photos of the garden help but are optional.
- A founder visits. Billy Maddox or Vincent O'Connell comes to the garden and measures the space.
- We check what decides the build: ground, levels, access, trees, and where the deck meets the house, including damp-proof course and air brick positions.
- You see samples and options. We talk through board samples, the frame and how you will use the space.
- You get an itemised written quote showing what is included.
Prefer to talk? Call 07470 419 056.
Decking Pages Across Our Service Area
Every area has its own page covering local ground, planning and access. See the London decking hub for the full range.
South East London
Bexley and Dartford
Bromley and the Kent Edge
South West London and Croydon
North East London
Schedule Your Bexley Decking Survey
Speak directly with founders Billy and Vincent for expert advice and a free on-site survey across Bexley Village DA5.